4kw dual-axis solar tracking system reference
|
|
|
|
|||
Module Number
|
12 units
|
Module Size
|
1650*992mm
|
|||
Tracking Precision
|
≤ 1°
|
Communicating Protocol
|
RS485-MODBUS
|
|||
Power Supply
|
90~264VAC,47~63HZ
|
Electricity Consumption
|
≤0.5(KW.h)
|
|||
X tracking Angle
|
-120°~ +120°
|
Y tracking Angle
|
+30°~ +90°
|
|||
Bracket Area
|
≈ 20m2
|
Operating Temperature
|
-40 ~ +70 ℃
|
|||
Bracket Material
|
Hot Galvanizing steel
|
Device Weight
|
≈ 600 KG
|
|||
Standard
|
GBT 29320-2012 ,CE,TUV
|
Design Life
|
> 25 years
|
Main Advantages:
Welcome to our company to see our patent and technology.
1) Power generation efficiency increased by 30%~50%.
2) Simple structure ,easy in installation and debugger application.
3).provide installation video ,introduction and foundation design drawing.
4) Cover a small area,you can grow shade-loving plant under the system.
5) The tracker could adjusts solar panels into horizontal level when meeting strong wind.
6) Exclusive design patent:dual axis solar bracket and solar controller.
Time
|
Dual axis (Kw.h)
|
Fixed(Kw.h)
|
5:00 - 6:00
|
0.17
|
0.05
|
6:00 - 7:00
|
4.8
|
0.57
|
7:00 - 8:00
|
8.75
|
2.96
|
8:00 - 9:00
|
10.02
|
5.78
|
9:00 - 10:00
|
10.5
|
8
|
10:00 - 11:00
|
10.6
|
9.56
|
11:00 - 12:00
|
10.6
|
10.3
|
12:00 - 13:00
|
10.75
|
10.67
|
13:00 - 14:00
|
10.78
|
10.2
|
14:00 - 15:00
|
10.48
|
8.79
|
15:00 - 16:00
|
10.12
|
7.08
|
16:00 - 17:00
|
9.2
|
4.09
|
17:00 - 18:00
|
5.73
|
0.75
|
18:00 - 19:00
|
0.5
|
0.3
|
Daily Total
|
113
|
79.1
|
Materials use Q235B steel with above 85um Hot-dipped zinc galvanization to ensure the 25 years life.Adapt to all kinds of outdoor environment.
Note:Our normally package is bubble wrap,if you need plywood packing,please let me know in advance.
Dual axis sun tracker packing Details : 5 packing/unit. 4 stere/unit. 1000KG/unit. 15 units/40 feet open top cabinets
Dual axis sun tracker delivery Details : generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, it is according to quantity.
1. Are you a factory ?
Yes, we are.
2. Where is your factory location ?
Our factory locates at Guhe East Branch Road, Zhong Tianmen Street, High-tech Zone, Taian City, Shandong Province, China
3. Which is your nearest port for delivery ?
Qingdao port
4. What will be the delivery time of your products ?
Normally in 5-10days if we have finished products in stock, production time of new ones is 20-35days.
5.Monthly output?annual output?
10mw/month, 1000mw/year
Thanks for subscribing!
This email has been registered!